> For the complete documentation index, see [llms.txt](https://resources.viewrail.com/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://resources.viewrail.com/install/express-cable-railing/express-tension-kit-installation/drivetite-kit-installation.md).

# DriveTite Kit Installation

<figure><img src="/files/UVGMbGMze3EfmrnkMRkt" alt=""><figcaption></figcaption></figure>

### Tools Needed For This Installation

{% columns %}
{% column %}

* Multi-Function Hand Tool
* Drill
* 3/16" Drill Bit
* T25 Torx Bit
  {% endcolumn %}

{% column %}

* Tape Measure
* Custom DriveTite Wrench ([Available Through Viewrail](https://shop.viewrail.com/drivetite-and-rodtite-wrench/p/277899/))
* Pencil
* Painter’s Tape
  {% endcolumn %}
  {% endcolumns %}

### Things to Know Before You Get Started

* Ensure that your posts and handrail are properly installed before beginning your cable installation
* For systems using both wood post as well as Viewrail metal posts, match\
  the hole spacing from the Viewrail metal posts
* It is suggested that this be a 2 person project
* Cable DriveTite Kits are designed to fasten into wood with a Janka Rating of 690 and above - See Page 3

{% hint style="info" %}
Tip: Open your cable spool inside a 5 gallon bucket. This will help contain\
the cable as it expands.
{% endhint %}

### Level DriveTite Installation

{% columns %}
{% column %}

<figure><img src="/files/hNnMCKwiq6FRYGZq3UnV" alt=""><figcaption></figcaption></figure>

* Apply a strip of painter’s tape vertically in the center of the post for marking and to protect the finish
* Run a pencil line down the center of the post
  {% endcolumn %}

{% column %}

<figure><img src="/files/KQoNeZfUvr2aSSpI4YtW" alt=""><figcaption></figcaption></figure>

* Measure 35/16" from the bottom of the handrail to mark the top hole location
* This location will be used as a reference point for the next hole - And that hole, a reference for the following\
  one, etc.

{% hint style="warning" %}
Building Code: The space between the handrail & top cable, between each cable, and between the bottom cable & the floor, must be less than 4"
{% endhint %}
{% endcolumn %}
{% endcolumns %}

{% columns %}
{% column %}

<figure><img src="/files/f73cBCM5rYHZy4T0qjTz" alt=""><figcaption></figcaption></figure>

* If you purchased the Custom DriveTite Wrench, center one of the holes of the wrench on the top hole you marked in Step 1
* With the wrench hanging down as shown, mark the next hole placement
* Continue down the post using the holes in the wrench to produce a 31/8" gap between marked locations
  {% endcolumn %}

{% column %}

<figure><img src="/files/pAZZDmEeLgm28UKnkFUE" alt=""><figcaption></figcaption></figure>

* Using a 3/16" drill bit, drill a 2" pilot hole into the post for each run of cable you marked in Step 3
  {% endcolumn %}
  {% endcolumns %}

{% columns %}
{% column %}

<figure><img src="/files/rtbnQz9S4Y6PuUJnxHkg" alt=""><figcaption></figcaption></figure>

* Slide the DriveTite Receiver on to the DriveTite Screw
* Using a T25 bit, fasten the screw into the pilot holes, securing the Receiver to the post
  {% endcolumn %}

{% column %}

<figure><img src="/files/ohbHW9ajaQQsRAevyv4w" alt=""><figcaption></figcaption></figure>

* Measure the distance between posts Surface mounted DriveTite Receivers
* Subtract 31/2" from the measurement
* This will be the “Needed Cable Length”
  {% endcolumn %}
  {% endcolumns %}

{% columns %}
{% column %}

<figure><img src="/files/F0vuS087xD2BjvjoZ2Fb" alt=""><figcaption></figcaption></figure>

* Cut the cable to the “Needed Cable Length” measured in Step 6
  {% endcolumn %}

{% column %}

<figure><img src="/files/ibHvIjwzwB5xNwqwj0WL" alt=""><figcaption></figcaption></figure>

* Slide the Cover onto the cable. You can tape the cover further up the cable run with painters tape to keep it out of the way
* Insert the Threaded Crimp Fitting onto the cable, make sure it is fully seated
* Crimp the fitting onto the cable
  {% endcolumn %}
  {% endcolumns %}

{% columns %}
{% column %}

<figure><img src="/files/P7CDI5Iy0OeKiN3q2BLV" alt=""><figcaption></figcaption></figure>

* Screw the DriveTite Turnbuckle on to the Threaded Crimp Fitting a couple of rotations
  {% endcolumn %}

{% column %}

<figure><img src="/files/P66cVWfi24t0VrWRr4TG" alt=""><figcaption></figcaption></figure>

* Begin to screw the Turnbuckle into the Receiver
* Use the DriveTite Wrench to tighten the Turnbuckle
* As the Turnbuckle tightens into the Receiver, the Threaded Crimp Fitting will be pulled further into the Turnbuckle

{% hint style="info" %}
Note: To help prevent the cable from spinning, you will need to use rubber sleeve and pliers to hold the cable so the turnbuckle pulls in the threaded crimp and itself rather than spinning the cable. If you are finding that is not working, then you can use Threadlocker Blue to help prevent them from spinning.
{% endhint %}

{% endcolumn %}
{% endcolumns %}

{% columns %}
{% column %}

<figure><img src="/files/sy0zPZqOl880ALcx0EAk" alt=""><figcaption></figcaption></figure>

* After all cables are ready, tension in sequence
  {% endcolumn %}

{% column %}

{% endcolumn %}
{% endcolumns %}

### Angle DriveTite Installation

<figure><img src="/files/G1O43E0GqfJGGSIri6mH" alt=""><figcaption></figcaption></figure>

{% columns %}
{% column %}

<figure><img src="/files/EAff9mHlNIWHNKPBoFCT" alt=""><figcaption></figcaption></figure>

* If you purchased the Custom DriveTite Wrench, center one of the holes of the wrench on the top hole you marked in Step 1
* With the wrench hanging down as shown, mark the next hole placement
* Continue down the post using the holes in the wrench to produce a 3 1/8" gap between marked locations

{% hint style="info" %}
Building Code: The space between the handrail & top run of infill, between each\
run of infill, and between the bottom run of infill & the floor, must be less than 4"
{% endhint %}
{% endcolumn %}

{% column %}

<figure><img src="/files/RlwmoJf4qJxmQ0FrKGvy" alt=""><figcaption></figcaption></figure>

* To determine your DriveTite locations, refer to Figure 1 on the previous page
* **Column A** refers to the angle of your stairs
* **Column B** shows how far down you need to mark from the underside of the handrail on the lowest post on the run
* **Column C** shows how far down you need to mark from the underside of the handrail on the highest post on the run
* Once you have your B and C marks, each of the remaining holes will be spaced 3 1/8" down
  {% endcolumn %}
  {% endcolumns %}

{% columns %}
{% column %}

<figure><img src="/files/iEYyRFAkAI5wYT0uLdCu" alt=""><figcaption></figcaption></figure>

* If you purchased the Custom DriveTite Wrench, center one of the holes of the wrench on the top hole you marked in Step 1
* With the wrench hanging down as shown, mark the next hole placement
* Continue down the post using the holes in the wrench to produce a 31/8" gap between marked location
  {% endcolumn %}

{% column %}

<figure><img src="/files/AVNLlsGJ62FhxV670FBw" alt=""><figcaption></figcaption></figure>

* Using a 3/16" drill bit, drill a 2" pilot hole into the post for each run of cable you marked in Step 3
  {% endcolumn %}
  {% endcolumns %}

{% columns %}
{% column %}

<figure><img src="/files/6kA5YljczvC9QRBqLnF0" alt=""><figcaption></figcaption></figure>

* Using the T-25 Bit, fasten the DriveTite Screw through the DriveTite Angle Mount and into the post
* Make sure the ears are vertical. You will likely have to hold the Angle Mount to keep it from turning. For elevated areas, it would be best to keep the set screw hole of the Angle Mount on the inside of the run where it is easily accessed
* Fasten tightly
  {% endcolumn %}

{% column %}

<figure><img src="/files/lKAoeOrMFTLGD7nJzdko" alt=""><figcaption></figcaption></figure>

* There are two ways to measure for your cable cut length
* Measure from the inside face of each end post and subtract 41/8"
* Because the Angle Mount could depress into the wood when tightening, you can also measure from the face of each Angle Mount and subtract 2¾"
* These two measurements should equal the same cut length
  {% endcolumn %}
  {% endcolumns %}

{% columns %}
{% column %}

<figure><img src="/files/4EOZe5OfFTVyp7yHjvJo" alt=""><figcaption></figcaption></figure>

* Cut the cable to the measurement indicated in Step 6
  {% endcolumn %}

{% column %}

<figure><img src="/files/l6uQ9Q2m2nPj1neAEa0M" alt=""><figcaption></figcaption></figure>

* If you have any intermediate posts on the run, drill out the pass through holes to the diameter desired
* The cable is 5/32" thick - It is recommended that the diameter of the holes be 5/16"
* Run your cable through any intermediate holes
* Apply any intermediate post hardware at this point
  {% endcolumn %}
  {% endcolumns %}

{% columns %}
{% column %}

<figure><img src="/files/iay2bcwaPTdGTG6M3L7M" alt=""><figcaption></figcaption></figure>

* Slide the Cover onto the cable. You can tape the cover further up the cable run with painters tape to keep it out of the way
* Insert the Threaded Crimp Fitting onto the cable, make sure it is fully seated
* Crimp the fitting onto the cable
  {% endcolumn %}

{% column %}

<figure><img src="/files/uWbHtMCPul5PyFHZl5dA" alt=""><figcaption></figcaption></figure>

* Step 10-12 should be on one side of the run only
* Thread the Turnbuckle into the Angle Receiver 2 turns
  {% endcolumn %}
  {% endcolumns %}

{% columns %}
{% column %}

<figure><img src="/files/eHWkVNsCulUSSnfnqZEk" alt=""><figcaption></figcaption></figure>

* Thread the Turnbuckle/Receiver combo onto the Threaded Crimp Fitting about 7 turns
* There should be 2 threads visible on the Threaded Crimp Fitting still
* During the process, make sure the Turnbuckle is not threading further into the Receiver
  {% endcolumn %}

{% column %}

<figure><img src="/files/SLToE9pH4pLkcZItxSXf" alt=""><figcaption></figcaption></figure>

* Take the assembled end and put the Angle Receiver inside the Angle Mount so that the set screw holes line up
* Using the 7/64" Allen wrench, tighten the Set Screw through each
* Complete Steps 8-10 for each cable on this side of the run
  {% endcolumn %}
  {% endcolumns %}

{% columns %}
{% column %}

<figure><img src="/files/yT7kbcmjO1k9RH3wxAev" alt=""><figcaption></figcaption></figure>

* Repeat Steps 10-12 for each cable on the other side of the run
* Since one end is already fastened, if the cut length is slightly too long, tighten the threaded crimp fitting or turnbuckles marginally until the set screw fits
* If the cut length is too short, loosen the threaded crimp fittings slightly until the set screw fits
  {% endcolumn %}

{% column %}

<figure><img src="/files/VgS7sncr078G3BXy7RJH" alt=""><figcaption></figcaption></figure>

* Once both ends are attached, use the DriveTite Wrench to tighten the Turnbuckles’ hex heads
* As the Turnbuckles tighten into the Receivers, because of the opposite threading, they will also pull in/tighten their corresponding Threaded Crimp Fittings
* Refer to Step 15 for the correct tightening pattern

{% hint style="info" %}
Note: To help prevent the cable from spinning, you will need to use rubber sleeve and pliers to hold the cable so the turnbuckle pulls in the threaded crimp. and itself rather than spinning the cable. If you are finding that is not working, then you can use Threadlocker Blue to help prevent them from spinning.
{% endhint %}

{% endcolumn %}
{% endcolumns %}

{% columns %}
{% column %}

<figure><img src="/files/ezolPXbrnFCbPEGIOLY3" alt=""><figcaption></figcaption></figure>

* Tighten each side in the represented sequence
* You can tighten one side and then the other until snug
* Once the Turnbuckles are tightened, remove any tape and slide each Cover up to the Turnbuckle
* Thread this onto the remaining exposed threads of the Turnbuckles for a tight seam
  {% endcolumn %}

{% column %}

{% endcolumn %}
{% endcolumns %}

***

### Get Help from Us

Is this not the product you're looking for? Troubleshoot your issue by contacting our customer service team. [866-432-0541](tel:8664320541) or <customerservice@viewrail.com>


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://resources.viewrail.com/install/express-cable-railing/express-tension-kit-installation/drivetite-kit-installation.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
