For the complete documentation index, see llms.txt. This page is also available as Markdown.

How do I Install a FLIGHT Cantilever System?

Learn how a FLIGHT Cantilever stair installs, from wall prep and bracket placement to tread assembly and glass railing.

FLIGHT Cantilever delivers a clean, modern stair with a rigid feel underfoot. It mounts directly to the wall face, so you can use the framing already in place and keep wiring between the studs.

Viewrail provides a custom template for the steel mounting brackets, along with project-specific instructions. For builders and installers handling multiple jobs, the process stays consistent and repeatable.

Installation overview

These are the basic steps for installing a FLIGHT Cantilever with Vedera glass railing. Your shipment also includes step-by-step instructions tailored to your project.

1

Step 1: Prepare the wall

Add 1 3/4-inch LVLs on both sides of each wall stud. Use L brackets at the top and bottom to tie the LVLs into the framing.

Next, mount the wall plate template, starting at the first tread location on the bottom-most run.

Use the template to place the aluminum brackets. These create more surface area for the mounting brackets during installation.

A wall frame with LVLs and aluminum brackets attached.
2

Step 2: Mount the wall plates

Set each steel plate on the plywood template. Screw the plate to the wall with eight to ten fasteners.

Each mounting plate includes multiple slots. This lets you place bolts accurately into both the wood framing and the aluminum angle brackets.

Mounting plates placed along the plywood template.
3

Step 3: Attach the tread arms

Attach the tread assembly to the wall plate by threading the bolts into the pre-tapped holes.

Then mount the tread arm assembly to the top of the inner arm. It slides back and forth so you can adjust tread arm length to match the tread width on your prints.

Tread arms attached to the mounting plates.
4

Step 4: Build out the wall

Install floor-to-ceiling AdvanTech subflooring to bring the wall flush with the mounting brackets. This also adds rigidity to support the full system.

Then add 1/2-inch furring strips to build the wall out past the bolts.

Add full sheets of plywood over that layer. This ties the furring strips to the AdvanTech subfloor.

Finish with 3/8-inch drywall to hide the brackets, bolts, and welds.

AdvanTech sublfooring installed
Furring strips attached
Plywood sheets installed
Finished with drywall
5

Step 5: Install the wood treads

Make sure each tread is perfectly level before you install the wood treads. Adjust the bolts on the underside of the steel treads to fine-tune the pitch of each step.

The wood treads fit over the tread pan with miter-locked corners. Bring the two tread pieces together, glue and clamp them, then install lighting if your project includes an LED route.

Wood treads installed onto to the tread arms
6

Step 6: Install the glass railing

Install your Vedera railing and the end caps. The railing helps stiffen the full system and completes the final look.

To compare compatible glass systems, see Choose a FLIGHT Glass Railing Style.

Last updated

Was this helpful?